Skip to content

Quality Control ​

Quality control defines the processes, procedures, and standards that ensure products and services meet quality requirements. This guide covers setting up and managing quality control.

Overview ​

Quality control enables you to:

  • Define quality control plans
  • Set acceptance criteria
  • Configure sampling procedures
  • Monitor process quality
  • Track quality metrics
  • Ensure compliance

Accessing Quality Control ​

Navigate to Quality → Control Plans or Settings → Quality → Control.

Understanding Quality Control ​

Control Plan Components ​

ComponentDescription
Control PointWhere quality is checked
CharacteristicWhat is measured
SpecificationRequired standard
MethodHow to check
FrequencyWhen to check
Reaction PlanWhat to do if fail

Control Types ​

TypeDescriptionApplication
PreventionStop defectsProcess design
DetectionFind defectsInspection
CorrectionFix defectsRework

Quality Levels ​

LevelDescription
CriticalSafety/regulatory
MajorFunction affected
MinorAppearance only
CosmeticPreference only

Setting Up Quality Control ​

Creating Control Plans ​

  1. Go to Quality → Control Plans
  2. Click New Control Plan
  3. Enter details:
FieldDescription
NamePlan identifier
ProductWhat it applies to
VersionRevision number
StatusDraft/Active
  1. Add control points
  2. Define characteristics
  3. Set specifications
  4. Activate plan

Control Point Setup ​

For each control point:

  • Location in process
  • Responsible person/team
  • Equipment required
  • Documentation needed

How-To Guides ​

How to Create Quality Control Plans ​

Plan Structure ​

Control Plan: CP-001
Product: Widget Assembly

Control Point 1: Incoming Material
├─ Check: Material certificate
├─ Check: Visual inspection
└─ Check: Dimensions

Control Point 2: Assembly
├─ Check: Component fit
├─ Check: Torque values
└─ Check: Alignment

Control Point 3: Final
├─ Check: Function test
├─ Check: Appearance
└─ Check: Packaging

Creating the Plan ​

  1. Define scope:

    • Products covered
    • Processes included
    • Stages applicable
  2. Identify control points:

    • Where quality matters
    • Critical operations
    • High-risk areas
  3. Define characteristics:

    • What to measure
    • Standards to meet
    • Tolerance limits
  4. Specify methods:

    • How to check
    • Equipment needed
    • Sample size
  5. Set frequency:

    • Every piece
    • Sampling
    • Periodic
  6. Document reaction:

    • What if fail
    • Escalation path
    • Corrective action

How to Define Acceptance Criteria ​

Criteria Types ​

TypeExample
AttributePass/Fail, Go/No-Go
VariableMeasurement ± tolerance
VisualReference standard
PerformanceTest requirements

Setting Specifications ​

Characteristic: Length
Nominal: 100 mm
Tolerance: ±0.5 mm
LSL: 99.5 mm
USL: 100.5 mm

Pass: 99.5 ≤ Actual ≤ 100.5
Fail: Outside limits

AQL Acceptance ​

Lot SizeSampleAcceptReject
2-8201
9-15301
16-25501
26-50801
51-901312

How to Configure Sampling Procedures ​

Sampling Plan Setup ​

  1. Go to Settings → Quality → Sampling
  2. Select sampling type:
    • Single sampling
    • Double sampling
    • Sequential sampling
  3. Configure parameters:
    • Lot size ranges
    • Sample sizes
    • Accept/reject numbers
  4. Save plan

Sampling Levels ​

LevelRigorUse When
TightenedMore samplesQuality issues
NormalStandardStable quality
ReducedFewer samplesProven quality

Switching Rules ​

Normal → Tightened:
  2 of 5 lots rejected

Tightened → Normal:
  5 consecutive lots accepted

Normal → Reduced:
  10 consecutive lots accepted
  AND production stable

How to Monitor Process Quality ​

SPC (Statistical Process Control) ​

Monitor process with control charts:

  • X-bar chart (average)
  • R chart (range)
  • p chart (proportion defective)
  • c chart (defects per unit)

Control Limits ​

UCL = X̄ + 3σ (Upper Control Limit)
CL = X̄ (Center Line)
LCL = X̄ - 3σ (Lower Control Limit)

Process Capability ​

IndexFormulaGood Value
Cp(USL-LSL)/6σ>1.33
CpkMin(Cpu, Cpl)>1.33
PpProcess performance>1.67

How to Implement Control Charts ​

Setting Up Charts ​

  1. Go to Quality → SPC
  2. Select characteristic
  3. Choose chart type
  4. Configure limits:
    • Specification limits
    • Control limits
    • Warning limits
  5. Enable monitoring

Reading Charts ​

PatternIndicates
Points within limitsIn control
Point outside limitOut of control
Run of 7Process shift
TrendGradual change
CyclePeriodic variation

Taking Action ​

When out of control:

  1. Stop process (if critical)
  2. Investigate cause
  3. Implement correction
  4. Verify correction
  5. Resume with monitoring

How to Manage Control Documentation ​

Required Documents ​

DocumentPurpose
Control PlanMaster control document
Work InstructionsHow to perform checks
Inspection RecordsResults documentation
Calibration RecordsEquipment verification

Document Control ​

  • Version management
  • Approval workflow
  • Distribution control
  • Retention policy

How to Handle Process Changes ​

Change Process ​

  1. Identify change:
    • Process modification
    • Material change
    • Equipment update
  2. Evaluate impact on quality
  3. Update control plan
  4. Validate effectiveness
  5. Train personnel
  6. Implement change
  7. Monitor results

Validation Requirements ​

After changes:

  • Initial capability study
  • First article inspection
  • Process validation
  • Control plan update

Advanced Features ​

Automated Monitoring ​

Real-time quality tracking:

  • Sensor integration
  • Automatic data collection
  • Alert generation
  • Dashboard display

Supplier Quality Control ​

Extend to suppliers:

  • Supplier control plans
  • Incoming inspection
  • Performance tracking
  • Quality agreements

Risk-Based Control ​

Focus on critical areas:

  • FMEA integration
  • Risk prioritization
  • Control allocation
  • Review frequency

Compliance Management ​

Regulatory requirements:

  • Standard compliance (ISO, etc.)
  • Audit preparation
  • Documentation requirements
  • Certification support

Best Practices ​

📋 Planning ​

  • Comprehensive coverage
  • Clear specifications
  • Appropriate sampling
  • Documented procedures

🔍 Execution ​

  • Consistent application
  • Calibrated equipment
  • Trained personnel
  • Timely recording

📊 Analysis ​

  • Regular review
  • Trend analysis
  • Capability studies
  • Continuous improvement

📝 Documentation ​

  • Complete records
  • Version control
  • Audit trail
  • Retention compliance

Configuration ​

Control Settings ​

Navigate to Settings → Quality → Control:

  • Control Levels - Severity definitions
  • Sampling Tables - AQL tables
  • SPC Parameters - Chart settings
  • Alert Thresholds - Warning levels

Plan Settings ​

  • Templates - Standard plans
  • Characteristics - Standard checks
  • Methods - Test procedures
  • Equipment - Measurement devices

Integration Settings ​

  • Production - Process linking
  • Inventory - Status integration
  • Documents - Record management
  • Alerts - Notification rules

Troubleshooting ​

Common Issues ​

Control chart showing out of control

  • Verify measurement accuracy
  • Check for special causes
  • Review process stability
  • Investigate and correct

Capability below target

  • Review specification limits
  • Analyze process variation
  • Identify improvement opportunities
  • Implement corrections

Plan not triggering inspection

  • Check activation status
  • Verify trigger conditions
  • Review workflow rules
  • Check integration

Data not collecting

  • Verify equipment connection
  • Check data entry
  • Review system settings
  • Test connectivity

Next Steps

Learn about Non-Conformance Management to handle quality issues and corrective actions.

Angage ERP Documentation